Site logo
Site logo
Site logo
  • Services
    • Prototype Construction
    • Assembly Cubings
    • Mould Construction
    • Tool Making
    • CNC+Individual
  • Solutions
    • Material
    • Machinery
      • DMU 340 G
      • Pantera 6500
      • DMU 340 P
      • DMU 210 P
      • DMU 200 P
    • Systems
  • About us
    • History
    • Certification
    • Jobs
  • News
  • Contact
    • How to drive
  • English
  • Deutsch

Hall modification

Banner image
1. Start of the construction site. All old things have to go.
Banner image
2. Thanks to the company Hof CNC machines, professional, clean and efficient.
Banner image
3. Slowly everything becomes empty.
Banner image
4. The emptiness only lasts for a short interlude.
Banner image
5. The Trautzl company builds the enclosure in one day.
Banner image
6. After Epiphanie 2018 the Stemmer and colleagues company takes over for long weeks ...
Banner image
7. …. And they find more surprises than expected.
Banner image
8. But they stay on schedule, despite the double reinforcement
Banner image
9. The walls are also concreted in a vibration proof way.
Banner image
10. Everything on schedule.
Banner image
11. Even with the enclosure, the project starts to take shape visually.
Banner image
12. The details have also been considered.
Banner image
13. One last time, the Trautzl company during the dismantling.
Banner image
14. Thanks to Bernhard Bach metalworkers it is also protected against falls.
backback
Stockacher Modell-u. Werkzeugbau GmbH
Gaswerkstr. 4, 78333 Stockach
Tel.: +49 7771 9368-0
info@baumann-gmbh.info
Home | How to drive | Data protection | Imprint
© Baumann